Safe, modern buildings
Condition surveys, reinforcement where necessary, facades, roofs, waterproofing, accessibility and fire-safety reviews.
Renovation, reopening, repositioning and extension of hotel buildings in Agadir.
Alongside new construction, older or closed hotel properties may need a complete technical and commercial upgrade. Agadir Investment can research the opportunity, arrange project checks and permits, manage reconstruction and deliver a modernised hotel ready for the client’s intended use.

Regional reporting in 2026 refers to 19 closed hotels in Agadir, while the precise number of unavailable beds differs across sources. This is an opportunity to investigate assets, not evidence that each site is available for purchase.
Sources: regional hotel-capacity report; SDR 2026 board statement; renovation programme. The 19 closed and 17 beneficiary groups are not necessarily the same establishments.
The regional SDR Tourisme Souss-Massa renovation mechanism states direct support of up to 30% of eligible renovation costs, with a cap of MAD 10 million per establishment, plus technical assistance.
A new 2026 call for expressions of interest was published in January; the publicly listed closing date was 17 February 2026. This should not be presented as an application currently open. Availability of any subsequent call must be checked directly with SDR/CRI.
Official programme notice ↗
A complete hotel modernisation programme combines operational positioning, building safety, technical systems and fit-out quality.
Condition surveys, reinforcement where necessary, facades, roofs, waterproofing, accessibility and fire-safety reviews.
HVAC, hot water, power distribution, lighting, elevators, plumbing, wastewater and smart controls sized for the actual hotel.
Room upgrades, bathrooms, kitchens, restaurants, meeting areas, pool systems and accessible public spaces.
| Phase | Scope | Result |
|---|---|---|
| 1. Asset review | Ownership/title, closure reason, maintenance backlog, location demand and existing licenses | Proceed, redesign or stop |
| 2. Feasibility | Refurbishment budget, room mix, renovation downtime, energy/water baseline and business case | Investment scope and phasing |
| 3. Authorisations | Required planning, building, safety and hotel-classification procedures | Approvals pathway |
| 4. Construction | Structural/technical works, reconfiguration, interior fit-out and external works | Completed upgraded asset |
| 5. Turnkey handover | Testing, defect checks and documentation | Building ready for the client’s commissioning process |
A building reported closed is not necessarily on the market, nor automatically eligible for subsidies. Property rights, causes of closure, cost and any future funding eligibility need individual investigation.