Manufacturing cost comparison

Does producing in Morocco actually improve your delivered economics?

Put your own numbers into a transparent model. A factory is commercially attractive only when product quality, delivery reliability, capital cost, duties and full operating costs are considered together.

01 / LANDED-COST COMPARISON

Compare the same finished product, delivered to the same customer.

The calculator starts blank. You can enter your own figures or load sample inputs to explore cost differences.

Assumptions in EUR

Per-unit costs include the manufacturing and landed-cost elements relevant to your product. Enter values before drawing a conclusion.

Estimated annual cost advantage of Morocco
— EUR
Alternative landed cost / unit
— EUR
Morocco landed cost / unit
— EUR
Unit cost difference
— EUR
Simple payback on additional CAPEX
Not established

The result is purely arithmetic. It is not profit, after-tax cash flow, NPV or an investment forecast. Inputs must account for real duties, origin status, import VAT, product compliance, utilities, quality, financing, inventories, exchange rates and potential CBAM obligations. Subsidies are deliberately excluded.

What is included in a credible landed-cost comparison?

Combine actual factory costs with the cost of getting conforming goods to the same end buyer. That includes raw materials and loss rates, labour productivity, energy, maintenance, freight, insurance, customs, tariffs, warehousing, quality control, warranty and support.

Separately test working capital, ramp-up delays, exchange-rate changes and demand concentration. A favourable unit-cost result cannot rescue an inadequate factory utilisation rate.

Public support is an upside to test, not a base-case discount

Morocco has support schemes that may provide up to 30% of eligible investment for qualifying projects, but thresholds, industry, location, stable job creation and convention conditions matter. Always prepare a base case without grants and an alternative case only after documented eligibility. [S02][S03]

Export rules can change the economics

Customs origin is decided by the product-specific rules and actual production process. CBAM obligations now apply to relevant imports under the 2026 definitive regime; products outside those sectors can have other EU technical requirements. Account for the actual importer and product. [S09][S10]

When is the project ready for an investor?

A serious feasibility stage includes an independently verified market, supplier quotations, site utilities, formal permitting path, customer offtake or letters of intent, financing terms, and downside scenarios. Use this calculator to decide which figures must be obtained—not to substitute for due diligence.