PARKS, SCHOOL AND SPORT AGADIR, MOROCCO

A new home for outdoor life.

Discover the public park, school and sporting developments adding new places to gather, play, learn and enjoy Tikiouine.

01 / TIKIOUINE

Thirty hectares of public space.

The planned park brings six landscape and activity sequences into one destination.

The Metropolitan Park of Tikiouine is designed as a place for leisure, sport, gardens and learning. The public project description covers 30 hectares arranged in six sequences, bringing together argan and olive groves, themed gardens, children’s playgrounds and sports grounds.

Rather than creating a single open lawn, the concept combines a network of paths and gathering spaces with facilities for different ages. This would give families a place to meet, exercise and enjoy outdoor time within their own district.

The published programme also includes a library, educational workshops, a museum, restaurants, kiosks and an artificial lake. Five pedestrian access points, a vehicle entrance and a planned 1,000-space parking facility are described in the project specification. These are planned components, not confirmation that every feature is already open.

Work has proceeded through multiple construction and landscaping packages. A contract for planting, irrigation, play and sport facilities was reported in September 2026. A confirmed public opening date has not yet been published.

Families enjoying green public parkland
02 / TIKIOUINE

A new school beside the park.

Education and recreation are being developed together in the immediate area.

A school is being built beside the Metropolitan Park, adding an educational function to an area already designed for recreation. For families, the proximity of education, outdoor activity and neighbourhood services is part of what makes an urban district practical and welcoming.

The exact school name, teaching level, capacity and delivery timetable remain to be confirmed against an official school project file. These details will be added when publicly documented.

The park design itself includes educational workshops and a proposed library. Together with the neighbouring school, these facilities could support learning outside the classroom as well as organised leisure activities.

As the projects progress, their value will be measured by how accessible and useful they become to nearby households—not just by the size of the construction programme.

03 / TIKIOUINE

A stadium in Tikiouine.

The Houssine Moudnib site is becoming a new focal point for sport.

In March 2026, the Agadir municipal council approved a partnership for a football stadium of approximately 15,000 seats in Tikiouine. The concept includes a natural-grass pitch, spectator stands, team facilities and the technical infrastructure needed for sporting events.

Construction activity is more than a drawing: a technical-training institution documented a site visit to the Houssine Moudnib stadium works on 1 July 2026.

A venue of this scale can strengthen neighbourhood sport and create a new setting for matches and community events. It also adds to Tikiouine’s identity as an active residential district—not simply a place people travel through on their way to central Agadir.

Project delivery and opening dates should be checked against the relevant municipal and construction authorities as work continues.

Football stadium and construction works
04 / TIKIOUINE

What happens next?

Public-space construction takes place in stages.

Landscaping, irrigation, play facilities and sports equipment are often installed at different points in a park’s development. Tikiouine’s documented tender history reflects that staged process.

In the meantime, the park remains a project in development. Visitors should not assume that all planned facilities are accessible.

As opening arrangements and park rules become available, this page can provide practical information about entrances, permitted activities and public access. Until then, it offers a documented view of the project and its intended role in the neighbourhood.

See the full project-status overview ↗