How do I inspect a newly built apartment in Agadir?
Inspecting a completed apartment is not the same as admiring a new building. At handover in Agadir, buyers should compare the actual apartment with the signed specification, inspect systems and finishes, document defects and understand what they are being asked to acknowledge. A careful inspection is particularly important for owners who plan to rent the property immediately or manage it from abroad.
This article sets out how to conduct the inspection in Agadir, what to check, and how to document the findings so that the reserves are enforceable.
Before the visit: the documents to bring
The inspection is not a courtesy visit. It is a comparison between what was promised and what was delivered. The buyer should bring the documents that define the promise: the preliminary contract, the specification (cahier des charges), the plans, and any written commitments from the developer .
The developer should provide, at or before the handover, the habitation permit (permis d'habiter) or the conformity certificate (certificat de conformité). Without that document, the apartment is not legally ready for occupation, and the buyer should question whether the handover can proceed .
The practical implication is that the buyer who arrives without the contract and the specification cannot verify the conformity. The inspection becomes a visual walk-through rather than a legal verification.
The tools and the method
The inspection should be conducted in the presence of the developer or their representative, in a contradictory visit (visite contradictoire). The buyer should allow at least one to two hours and bring a lamp, a phone charger to test the sockets, a tape measure, and a camera .
The method is a room-by-room sequence, following the same order as the specification. ReaConsult's checklist sets out the sequence: the conformity to the specification and the plans (surfaces, layout, materials, equipment), the functioning of the equipment (doors, windows, taps, flushes, sockets, switches, shutters, water heater), the seals and the finishes (bathroom and kitchen joints, thresholds, traces of damp, paint, tiling, skirting boards, joinery), and the networks and safety (electrical panel, water supply and drainage, ventilation) .
The practical implication is that the inspection should be systematic, not impressionistic. A buyer who walks through the apartment without a checklist will miss the defects that are not immediately visible.
What to check, room by room
The inspection should cover the specific elements that are most likely to be defective in a new-build.
The surfaces and the layout. Measure the area and compare it with the contract. Check the layout against the plans. A deviation from the authorised plan is a reserve .
The equipment. Open and close every door and window. Test every tap, flush, socket, switch, and shutter. Test the hot water and the air conditioning. A non-functioning element is a reserve .
The seals and the finishes. Check the bathroom and kitchen joints, the thresholds, the traces of damp, the paint, the tiling, the skirting boards, and the joinery. These are the defects that the guarantees do not cover, and they can only be remedied if they are noted as reserves .
The networks and the safety. Check the electrical panel, the water supply and drainage, and the ventilation. For the common areas, the inspection should cover the elements that are detailed in the building's handover to the syndic .
The reserves: how to write them
The reserve is the written mention, in the acceptance report, of a defect that has been observed. A vague reserve protects poorly; a precise reserve protects. ReaConsult's method is to localise and describe each defect without ambiguity: the room, the location, the nature of the defect. A dated photograph annexed to the report is worth more than a sentence .
The report should also fix the deadline for the lifting of the reserves. In practice, this is specified in the report; if it is not, the applicable regulation should be confirmed with the notary .
The practical implication is that the reserves are not a complaint. They are the mechanism that activates the one-year perfect completion guarantee (garantie de parfait achèvement), which obliges the developer to repair the defects noted at the handover and those that appear during the following year .
The guarantees and their limits
The VEFA framework provides three guarantees that start at the acceptance. The one-year perfect completion guarantee covers the defects noted at the handover and those that appear during the following year. The two-year guarantee covers the dissociable equipment (shutters, taps, heating, air conditioning). The ten-year guarantee covers the defects that compromise the solidity of the building or make it unfit for its purpose .
But many of the defects that appear at handover fall outside the two-year and ten-year guarantees: poor paintwork, badly installed seals, scratched glazing, missing equipment, or a deviation from the specification. These defects can only be remedied if they are listed as reserves in the acceptance report .
The practical implication is that the buyer should not rely on the guarantees to fix the finishing defects. The guarantees cover the structure and the equipment, not the cosmetic or specification issues.
When to refuse the acceptance
The buyer is not obliged to accept a handover that is not in accordance with the contract. If the defects are significant, or if the habitation permit is missing, the buyer can refuse the acceptance. The refusal should be justified in writing, and the buyer should state the reasons .
The refusal has consequences. The developer remains responsible for the apartment, and the buyer's final payment may be deferred until the defects are remedied. The buyer should take legal advice before refusing, because a refusal that is not justified can expose the buyer to a claim for the balance .
The practical implication is that the refusal is a remedy of last resort. The buyer should first attempt to negotiate a written commitment from the developer to remedy the defects within a defined period.
The Agadir context
Agadir has an active off-plan market, with several developers delivering projects in different districts. The VEFA framework applies to all of them, and the inspection process is the same. But the quality of the developers varies, and the buyer should be prepared for the inspection.
For a buyer who lives abroad, the inspection is a particular challenge. The buyer may not be able to attend in person, and may rely on a representative. The representative should be someone with the technical knowledge to conduct the inspection, or the buyer should appoint an independent expert to attend on their behalf. An expert can identify the defects that a non-specialist would miss, and can produce a documented list of reserves that is enforceable against the developer .
So how do you inspect?
The inspection is a systematic comparison between the contract and the delivered apartment, conducted room by room, with the documents in hand and a camera to record the findings. The reserves should be precise, dated, and annexed to the acceptance report. The buyer who inspects methodically and documents the defects is protected. The buyer who signs without reserves accepts the apartment as it is.
The buyers who do well are the ones who treat the inspection as a legal verification, not a courtesy visit. The ones who struggle are the ones who trust the developer, sign the report without reading it, and discover the defects after the keys have been handed over.
Inspect common areas as well as the private apartment
The front door is not the beginning or end of the investment. Check the lift if one was promised, access routes, stair lighting, fire-related equipment where installed, parking allocation, drainage around entrances and the condition of shared gardens or facilities. Ask which elements are complete and which remain under the developer's responsibility. A well-finished apartment can still be difficult to rent when the common areas are unsafe, inaccessible or unfinished.
For a furnished rental, evaluate how future guests will actually use the space. Test water pressure at more than one outlet, confirm electricity supply under normal load and inspect ventilation, doors and window seals. At a coastal site, inspect exposed metalwork and fixtures for the quality of their protective finish. Take dated photographs and record the room and location of each defect; a vague note such as 'bathroom incomplete' is much less useful than a specific item that a contractor can correct.
Finish the inspection with a written action list
Before signing a handover document, number the identified defects, agree who will remedy each one and record an expected completion process. Check the list against the final apartment specification rather than the marketing brochure alone. Keep copies of manuals, available guarantees, meter readings, key counts and any certificates that are required for occupancy. Where a significant issue is disputed, obtain independent technical and legal advice before accepting it as a minor snag.
An owner who lives abroad should not assume that someone else will notice defects after handover. If a local representative attends the inspection, agree beforehand what they are authorised to sign, request a full photographic report and preserve a written trail of outstanding work. A thorough inspection protects the usability of the apartment and makes property management much simpler from the first day.
Investment opportunities with Agadir Investment
Agadir Investment works with international buyers seeking exposure to the Agadir property market and the wider Souss region. There are two principal routes.
1. Property investment
Investors can purchase property in Agadir across a range of types: apartments, new-build residences, villas, holiday homes, buy-to-let properties and long-term holdings. Agadir Investment also provides property management services, so owners who do not live in Morocco can have their property managed on their behalf — covering day-to-day operations, guest or tenant handling, and maintenance coordination — without needing to be present.
2. Investment in property development
For larger investors, there is the option to invest directly in the financing and development of property projects. For investments from €5,000,000, Agadir Investment states a fixed, guaranteed return of 7% per year. This is not an estimated or variable return but the stated fixed rate, subject to the applicable contractual terms. Investors considering this route should review those terms carefully with their own advisers before committing.
Contact
To discuss either route, or to request current availability and documentation, contact Agadir Investment at agadirinvestment.com or by email at info@agadirinvestment.com.