What happens during the handover of a new apartment in Agadir?

The handover (réception) is the most consequential moment of an off-plan purchase. It is the point at which the developer delivers the completed apartment, the buyer inspects it, and both parties sign the acceptance report (procès-verbal de réception). That document determines what the developer is obliged to repair and what the buyer is deemed to have accepted. A defect that is noted in the report remains the developer's responsibility. A visible defect that is not noted becomes the buyer's problem .

This article explains what happens during the handover in Agadir, how to prepare for it, and what to do if the apartment is not ready.

The convocation and the documents

The process begins with a written convocation from the developer. The buyer should receive the date, the time, and the documents that will be available at the handover. The buyer should not attend without the documents that define what was promised: the preliminary contract, the specification (cahier des charges), the plans, and the notices .

The developer should provide, at or before the handover, the habitation permit (permis d'habiter) or the conformity certificate (certificat de conformité). Without that document, the apartment is not legally ready for occupation, and the buyer should question whether the handover can proceed .

The practical implication is that the handover is not a spontaneous event. It is a scheduled inspection that requires preparation. A buyer who arrives without the contract and the specification cannot compare what was promised with what was delivered.

The inspection, room by room

The inspection is conducted in the presence of the developer or their representative. It is a contradictory visit (visite contradictoire), meaning both parties are present and both sign the report. The buyer should allow at least one to two hours and should bring a lamp, a phone charger to test the sockets, a tape measure, and a camera .

The inspection should follow a methodical sequence. The buyer should compare the surface area, the layout, the materials and the equipment with the contract and the specification. They should test every door and window, every tap and flush, every socket and switch, the hot water, the air conditioning, and the ventilation. They should check the seals in the bathroom and the kitchen, look for traces of damp, and examine the finishes .

The practical implication is that the inspection is not a courtesy visit. It is the buyer's only opportunity to identify the defects before the acceptance report is signed. A superficial inspection is a decision to accept the defects.

The acceptance report and the reserves

The acceptance report (procès-verbal de réception) is the document that records the outcome. If there are no defects, the buyer signs without reserves. If there are defects, the buyer lists them as reserves (réserves). The list should be precise: the room, the location, the nature of the defect, and a photograph. A vague reserve such as "bathroom to review" protects the buyer poorly; a precise reserve protects them .

The reserves activate the one-year perfect completion guarantee (garantie de parfait achèvement). That guarantee obliges the developer to repair the defects noted at the handover, and any defects that appear during the following year, excluding normal wear and tear or misuse . The two-year guarantee covers the dissociable equipment, such as shutters, taps, heating and air conditioning. The ten-year guarantee covers defects that compromise the solidity of the building or make it unfit for its purpose .

The practical implication is that the reserves are not a complaint. They are the mechanism that triggers the guarantee. A buyer who signs without reserves loses the benefit of the guarantee for the visible defects.

What the guarantees do not cover

The guarantees do not cover everything. Many of the defects that appear at handover fall outside the two-year and ten-year guarantees: poor paintwork, badly installed seals, scratched glazing, missing equipment, or a deviation from the specification. These defects can only be remedied if they are listed as reserves in the acceptance report .

The practical implication is that the buyer should not rely on the guarantees to fix the finishing defects. The guarantees cover the structure and the equipment, not the cosmetic or specification issues. The reserves are the only route for those.

What to do if the apartment is not ready

The buyer is not obliged to accept a handover that is not in accordance with the contract. If the defects are significant, or if the habitation permit is missing, the buyer can refuse the handover. The refusal should be justified in writing, and the buyer should state the reasons .

The refusal has consequences. The developer remains responsible for the apartment, and the buyer's final payment may be deferred until the defects are remedied. The buyer should take legal advice before refusing, because a refusal that is not justified can expose the buyer to a claim for the balance .

The practical implication is that the refusal is a remedy, but it is a remedy of last resort. The buyer should first attempt to negotiate a written commitment from the developer to remedy the defects within a defined period, and should only refuse the handover if the developer is unable or unwilling to provide that commitment.

The Agadir context

Agadir has an active off-plan market, with several developers delivering projects in different districts. The VEFA framework applies to all of them, and the handover process is the same. But the quality of the developers varies, and the buyer should be prepared for the inspection .

For a buyer who lives abroad, the handover is a particular challenge. The buyer may not be able to attend in person, and may rely on a representative. The representative should be someone with the technical knowledge to conduct the inspection, or the buyer should appoint an independent expert to attend on their behalf. An expert can identify the defects that a non-specialist would miss, and can produce a documented list of reserves that is enforceable against the developer .

So what happens at the handover?

The handover is a contradictory inspection, a written report, and a list of reserves. The report determines what the developer must repair and what the buyer accepts. The reserves activate the guarantees. The buyer who prepares for the inspection, documents the defects, and lists them precisely is protected. The buyer who signs without reserves accepts the apartment as it is.

The buyers who do well are the ones who bring the contract and the specification, inspect methodically, and refuse to sign until the defects are documented. The ones who struggle are the ones who trust the developer, sign the report without reading it, and discover the defects after the keys have been handed over.


Investment opportunities with Agadir Investment

Agadir Investment works with international buyers seeking exposure to the Agadir property market and the wider Souss region. There are two principal routes.

1. Property investment

Investors can purchase property in Agadir across a range of types: apartments, new-build residences, villas, holiday homes, buy-to-let properties and long-term holdings. Agadir Investment also provides property management services, so owners who do not live in Morocco can have their property managed on their behalf — covering day-to-day operations, guest or tenant handling, and maintenance coordination — without needing to be present.

2. Investment in property development

For larger investors, there is the option to invest directly in the financing and development of property projects. For investments from €5,000,000, Agadir Investment states a fixed, guaranteed return of 7% per year. This is not an estimated or variable return but the stated fixed rate, subject to the applicable contractual terms. Investors considering this route should review those terms carefully with their own advisers before committing.

Contact

To discuss either route, or to request current availability and documentation, contact Agadir Investment at agadirinvestment.com or by email at info@agadirinvestment.com.