What if the finished apartment is different from the plans?

A buyer of a newly built apartment may discover that the finished property does not match the approved plans, advertised specification or signed contract. The problem could concern the floor area, layout, fixtures, parking, common facilities or completion date. The correct response is to compare written documents with what has been delivered, preserve evidence and seek advice before signing an unconditional handover acceptance.

This article explains what the buyer can do when the finished apartment differs from the plans, what the law requires, and how to build the case before the handover.

The contract is the reference, not the brochure

The first principle is that the developer is bound by the contract, not by the marketing material. The VEFA framework (Law 44-00) requires the preliminary contract to include a description of the property, the specification (cahier des charges), the plans, and the delivery date . The plans must carry the mention "ne varietur" (not to be changed), and the specification must define the materials and the equipment .

If the finished apartment does not match the contract and the annexed specification, the buyer has a claim for non-conformity. The claim is not based on whether the buyer likes the apartment, or whether the difference is aesthetically pleasing. It is based on whether the delivered property conforms to what was contractually promised.

The practical implication is that the buyer should keep the contract and the specification in a safe place, and should compare the delivered apartment against those documents, not against the show flat or the brochure. The show flat is a marketing tool; the contract is the legal reference.

What counts as a non-conformity

Not every difference is a non-conformity. A minor variation in the shade of a paint, or a slight difference in the position of a light switch, is unlikely to give rise to a claim. But the following differences are material.

The surface area. If the delivered area is smaller than the contracted area, the buyer has paid for something they did not receive. The contract should state the area, and the buyer should measure the property during the handover inspection .

The layout. If the number of rooms, the position of the walls, or the configuration of the space is different from the approved plans, the property is not the one that was sold.

The materials and the equipment. If the specification states a particular brand or quality of tiles, sanitary ware, kitchen equipment, or air conditioning, and the developer has installed a cheaper alternative, the buyer has a claim. The specification should define the materials precisely enough to be enforceable .

The missing features. If a parking space, a storage area, a terrace, or a common facility was included in the contract and is not delivered, the buyer has a claim.

The practical implication is that the buyer should compare the delivered apartment against the contract item by item, during the handover inspection, and should list every material difference as a reserve.

The reserve at the handover is the first step

The handover inspection is the moment when the non-conformity should be documented. The buyer should list the differences as reserves in the acceptance report (procès-verbal de réception). A precise reserve, with the room, the location, the nature of the difference, and a photograph, is the evidence that the buyer will need if the developer refuses to remedy the issue .

The reserve activates the one-year perfect completion guarantee (garantie de parfait achèvement), which obliges the developer to repair the defects and remedy the non-conformities noted at the handover. If the developer refuses, the buyer can pursue the claim through the courts .

The practical implication is that the buyer should not sign the acceptance report without listing the non-conformities. A buyer who signs without reserves is deemed to have accepted the apartment as it is, and the remedy becomes much more difficult.

What if the non-conformity is discovered after the handover?

The buyer has a period of one year to report the defects and non-conformities that were not apparent at the handover. The perfect completion guarantee covers the defects that appear during the year following the acceptance . The ten-year guarantee covers the defects that compromise the solidity of the building or make it unfit for its purpose .

But the buyer should not rely on the guarantees for the specification issues. A difference in the materials, or a missing feature, is not necessarily a structural defect or a functional defect. It is a contractual non-conformity, and the remedy is the one provided by the contract and the general law of obligations.

The practical implication is that the buyer should report the non-conformity as soon as it is discovered, in writing, and should keep the evidence. The longer the delay, the weaker the position.

Refusing the handover

If the non-conformities are significant, the buyer can refuse the handover. The refusal should be justified in writing, and the buyer should state the reasons. The developer remains responsible for the apartment, and the final payment may be deferred until the non-conformities are remedied .

But the refusal is a remedy of last resort. The buyer should take legal advice before refusing, because a refusal that is not justified can expose the buyer to a claim for the balance. The better approach is to negotiate a written commitment from the developer to remedy the non-conformities within a defined period, and to withhold the final payment until the work is done.

The practical implication is that the refusal is a negotiating tool, not a first response. The buyer who refuses without a legal basis may find themselves in a weaker position than the buyer who documents the non-conformity and negotiates a remedy.

The Agadir context

Agadir has an active off-plan market, with several developers delivering projects in different districts. The VEFA framework applies to all of them, and the rules on conformity are the same. But the quality of the developers varies, and the buyer should be prepared for the possibility that the delivered apartment will not match the plans.

For a buyer who lives abroad, the risk is higher, because the buyer cannot easily visit the site during the construction or inspect the apartment at the handover. The buyer should appoint an independent expert to inspect the property on their behalf, and should ensure that the expert has the contract and the specification to compare against .

So what can you do?

The buyer can document the non-conformity as a reserve at the handover, activate the perfect completion guarantee, negotiate a remedy with the developer, or refuse the handover if the differences are significant. The contract and the specification are the reference, and the evidence should be collected as early as possible.

The buyers who do well are the ones who compare the delivered apartment against the contract, list the differences precisely, and refuse to accept the apartment until the non-conformities are remedied. The ones who struggle are the ones who accept the developer's explanation that the difference is minor, sign the acceptance report, and discover later that the apartment is not the one they paid for.

Separate changes that were authorised from changes that were not

Review every signed amendment to the reservation contract or building specification. Developers sometimes propose substitute materials or minor layout adjustments during construction; whether these are permitted depends on the agreed documents and applicable law. Do not treat a verbal explanation as proof that a material substitution was approved. Compare the finished floor area, orientation, number of rooms, access to facilities and any parking allocation with the documents that formed part of the purchase.

Record a clear sequence of evidence: original plan, signed specification, amendments, photographs at inspection and correspondence explaining the difference. A small cosmetic variation may be resolvable through an agreed correction; a substantial change in layout or area may affect value and use and warrants legal advice. The point is to make the discussion specific rather than relying on the buyer's memory of a sales presentation.

Protect your position during handover

Do not sign a statement that everything complies if you have identified significant differences. Ask for the objections to be written into the handover record and make sure you retain a copy. The exact rights and remedies depend on the contract and the relevant legal procedures, so an independent adviser should assess substantial disagreements rather than assuming a universal refund or compensation rule.

If the apartment is intended for rental, calculate the commercial impact of the change. Losing a second bedroom, parking space or promised access facility can alter the tenant profile and expected income. Keeping the investment calculation separate from the legal claim helps the owner decide whether to seek correction, negotiate an adjustment or take other lawful steps. Above all, do not let pressure to receive the keys replace careful documentation.

Avoid relying on a verbal promise of correction

If the developer offers to remedy a discrepancy after the keys are handed over, ask for a written description of the proposed work and the process for confirming completion. Keep dated photographs before and after the changes, and do not dispose of the signed specification. An informal conversation may later be remembered differently by both sides.

The objective is to turn a disagreement into a list of specific, verifiable items. That is more useful to an inspector, a notary or a legal adviser than a general complaint that the apartment is disappointing.


Investment opportunities with Agadir Investment

Agadir Investment works with international buyers seeking exposure to the Agadir property market and the wider Souss region. There are two principal routes.

1. Property investment

Investors can purchase property in Agadir across a range of types: apartments, new-build residences, villas, holiday homes, buy-to-let properties and long-term holdings. Agadir Investment also provides property management services, so owners who do not live in Morocco can have their property managed on their behalf — covering day-to-day operations, guest or tenant handling, and maintenance coordination — without needing to be present.

2. Investment in property development

For larger investors, there is the option to invest directly in the financing and development of property projects. For investments from €5,000,000, Agadir Investment states a fixed, guaranteed return of 7% per year. This is not an estimated or variable return but the stated fixed rate, subject to the applicable contractual terms. Investors considering this route should review those terms carefully with their own advisers before committing.

Contact