What should I do if my apartment in Agadir needs major repairs?
The first thing to do is to establish whether the repair is your responsibility or the building's. The second thing is to establish whether the repair requires a permit. The third is to find a contractor who is competent, insured, and accountable. The fourth is to document everything. Major repairs are stressful in any country, but in Agadir the stress is amplified by the distance, the language, and the unfamiliarity of the local construction market. The owner who follows a structured process is protected. The owner who reacts impulsively is exposed.
This article sets out the sequence for handling major repairs in an Agadir apartment, from the diagnosis of the responsibility to the selection of the contractor and the management of the works.
Step one: establish who is responsible
The first question is whether the repair falls on the owner, on the co-ownership, or on a third party. The answer depends on the nature of the defect and its location.
Under Moroccan law, the owner is responsible for the major repairs (grosses réparations) that affect the structure and the essential equipment of the property. The tenant is responsible for the routine maintenance (réparations courantes) . The co-ownership is responsible for the common areas: the roof, the façade, the lift, the stairs, the shared plumbing and the shared electrical systems.
If the defect originates in the common areas, the co-ownership is liable. The syndic is the legal representative of the co-ownership, and the syndicate is responsible for the damage caused to the co-owners or third parties by the lack of maintenance of the common areas . The owner should report the problem to the syndic and request that the general assembly address it.
If the defect is in the private unit, the owner is liable. That includes the interior plumbing, the electrical system within the unit, the kitchen, the bathroom, and the interior finishes.
If the defect originates from a neighbouring unit, the neighbour may be liable. A water leak from the apartment above, for example, is the neighbour's responsibility, and the owner should document the damage and request that the neighbour repair the source.
The practical implication is that the responsibility determines the cost and the process. The owner should not assume that a repair is theirs before checking whether it falls on the building or a third party.
Step two: check whether a permit is required
The second question is whether the repair requires a permit from the communal authority. Not every repair does, but the ones that affect the structure, the façade, or the layout do.
The Moroccan planning framework distinguishes between the works that require a building permit (permis de construire) and the works that require a repair permit (rخصة الإصلاح). The repair permit covers the minor works on existing buildings that do not change the use of the property or affect the structural elements, the common areas, the columns, the façades, or the internal layout. The permit is issued by the president of the communal council within ten days of the application .
For the works that do affect the structure, the façade, or the layout, a building permit is required. Armonia Solutions, which manages renovation projects in Agadir, notes that for the interventions that modify the structure or the façade, the building permit is issued by the communal authority, and that some buildings are subject to specific constraints .
The practical implication is that the owner should check the scope of the repair against the permit requirements before the contractor starts the work. A repair that is done without the required permit can expose the owner to fines and to an order to restore the property to its previous state.
Step three: select the contractor carefully
The third question is the contractor. The Agadir construction market has a range of operators, from the structured general contractors to the independent artisans, and the quality varies. The owner should follow a structured selection process.
DARNÉO's 2026 guide to selecting a contractor in Agadir sets out the method. The owner should define the scope of the works and the budget, pre-select three providers with local references and insurance, compare the quotes on the same scope and the same level of finish, visit at least one completed project, and sign a clear contract with the deadlines, the payment schedule, the guarantees, and the reception procedure .
The guide also identifies the warning signs that should cause the owner to walk away: a quote delivered in less than 24 hours without a site visit, a price significantly lower than the other offers without a technical explanation, a refusal to provide the insurance certificate or the professional liability cover, a demand for a large payment before the works start, and commercial pressure .
The practical implication is that the contractor selection is the most important decision in the repair process. The cheapest quote is not the best quote if the contractor is not insured, not competent, or not accountable.
Step four: manage the works and document everything
The fourth step is the management of the works. The owner who lives abroad needs a local representative to supervise the site, validate the progress, and approve the payments. A professional project manager or a trusted local contact can perform this role.
The documentation should include the contract, the detailed quote, the permit (if required), the photographs of the before and after, the invoices for every payment, and the reception report. The reception report is the document that records the completion of the works and the reserves, and it is the basis for the guarantee.
Armonia Solutions, which coordinates renovation works for owners in Agadir and Taghazout, describes the service as including the selection of the companies, the control of the site, and the management of the authorisations . For an overseas owner, that kind of professional support is often the difference between a repair that is done properly and one that creates new problems.
The practical implication is that the works should be managed, not left to the contractor. The owner should have a local representative, a payment schedule tied to progress, and a documented reception.
The Agadir context
Agadir has a specific construction environment. The coastal climate imposes constraints: the salt air, the humidity, the wind, and the thermal variations affect the materials and the durability of the works. DARNÉO's guide notes that a local company knows the suppliers, the logistical delays, the reliable artisans, and the specific constraints of the coastal districts .
The city also has a history of building defects that have required public intervention. In May 2026, the wali of the Souss-Massa region ordered the formation of a technical commission to inspect the "Miftah Sahel" residential complex in Anza, after cracks appeared in several buildings following a water pipe leak. The commission was tasked with a full technical expert appraisal to determine the causes and the remedies . That case illustrates the importance of addressing structural issues promptly and with qualified professionals.
The municipal planning for Temsia provides for a development area of around 62 km² with capacity for a future population of 76,585 by 2035. The city is growing, and the construction sector is active. The owner who needs a major repair should choose the contractor and the process with the same care as the original purchase.
So what should you do?
Establish the responsibility, check the permit requirements, select the contractor through a structured process, and manage the works with a local representative and a complete documentation file. The repair is a project, not an emergency, and the owner who treats it as a project is protected.
The owners who do well are the ones who diagnose the problem correctly, verify the permits, choose a contractor with references and insurance, and document every step. The ones who struggle are the ones who react impulsively, hire the first contractor who answers the phone, and discover that the repair was done without a permit, without a guarantee, or without addressing the underlying cause.
Investment opportunities with Agadir Investment
Agadir Investment works with international buyers seeking exposure to the Agadir property market and the wider Souss region. There are two principal routes.
1. Property investment
Investors can purchase property in Agadir across a range of types: apartments, new-build residences, villas, holiday homes, buy-to-let properties and long-term holdings. Agadir Investment also provides property management services, so owners who do not live in Morocco can have their property managed on their behalf — covering day-to-day operations, guest or tenant handling, and maintenance coordination — without needing to be present.
2. Investment in property development
For larger investors, there is the option to invest directly in the financing and development of property projects. For investments from €5,000,000, Agadir Investment states a fixed, guaranteed return of 7% per year. This is not an estimated or variable return but the stated fixed rate, subject to the applicable contractual terms. Investors considering this route should review those terms carefully with their own advisers before committing.
Contact
To discuss either route, or to request current availability and documentation, contact Agadir Investment at agadirinvestment.com or by email at info@agadirinvestment.com.
